Polimerica

HOT TOPIC |

CO2 packaging Piovan Plastics Consult
Forgot your password? Register to access
  • Home
  • News
  • Events
  • Video
  • About Us
  • Sign up free
  • Advertising
  • Contact Us
  • Privacy

By Carlo Latorre

Home | Home | News |
Last News
  • image Six priorities for circular plastics
  • image Sphere boosts flexible packaging
  • image Röchling expands sheet business in Spain
  • image Plastiflex invests in Italian healthcare
  • image Syensqo doubles compounding capacity in India
  • image PLA recycling closes the loop
  • image Mutares buys Magna roof unit
  • image UK plastics tax revenue declines
  • image CMG chooses India for expansion
  • image Cuaz takes over at EuPC
  • image Five hurdles for plastics recycling
  • image Billion stops building IMM
  • image Farewell to packaging pioneer Bruno Crocco
  • image Austrotherm targets Ursa XPS
‹ ›

Final ethylene furnaces arrive for Project ONE

The four giant furnaces, shipped from Thailand, will be installed in the ethane cracker Ineos is building in Belgium.

April 7, 2025 15:19

fournaces fot Project One of IneosThe final four furnaces for the ethane cracker being built by Ineos as part of Project ONE have arrived by sea at the Port of Antwerp. The massive components were shipped from Thailand, where they were manufactured.
Two furnaces had already reached the Belgian port in January, marking the first shipment for the project.

Managed by Ineos Olefins Belgium, Project ONE involves the construction of a state-of-the-art steam cracker in Lillo, Antwerp. The facility will have a production capacity of 1.45 million tonnes of ethylene per year and is scheduled to begin operations next year. The total investment is estimated at more than €4 billion.

The cracker is designed to run on low-carbon hydrogen in the future and will feature carbon capture technology. It will also be capable of operating with electric furnaces once that technology becomes commercially viable.

Lillo site IneosThe furnaces could not be built directly at the Belgian site due to the need for specialized expertise in both manufacturing and assembly. In addition, only a limited number of shipyards worldwide have the capacity to accommodate ocean-going vessels and construct such large-scale modules.
The Antwerp site also lacks sufficient space to store materials or assemble the massive units while civil and underground works are underway.

© Polimerica -  Reproduction prohibited, all rights reserved

Number of readings: 2944
  • cracker
  • ethylene
  • Ineos
  • Project ONE
Share this article on
Print this article

RELATED ARTICLES

EU clears Ineos-Sinopec JV
Amsterdam rejects ethylene damages claims
Dow files new ethylene cartel claim
Ineos cracker bypasses Strait of Hormuz
Norwegian pyrolysis project unveiled
Ineos to close PS plant in Illinois

FOLLOW US

Home
- News - Events - Video - About Us - Sign up free - Advertising - Contact Us - Privacy

Polimerica - Plastics & Rubber News - International edition

Magazine registered at the Milan Court, n.710 - 11/10/2004 - (supplemento a Polimerica)
Editor-in-Chief (Direttore responsabile): Carlo latorre
Redazione: redazione@polimericanews.com
© Cronoart Srl - Milan (Italy)
ISSN 1824-8241 - P.Iva 03143330961
Contact us - Privacy
Reproduction prohibited, all rights reserved. Designed and Powered by JoyADV snc