Polimerica

HOT TOPIC |

CO2 packaging Piovan Plastics Consult
Forgot your password? Register to access
  • Home
  • News
  • Events
  • Video
  • About Us
  • Sign up free
  • Advertising
  • Contact Us
  • Privacy

By Carlo Latorre

Home | Home | News |
Last News
  • image Plastiflex invests in Italian healthcare
  • image Syensqo doubles compounding capacity in India
  • image PLA recycling closes the loop
  • image Mutares buys Magna roof unit
  • image UK plastics tax revenue declines
  • image CMG chooses India for expansion
  • image Cuaz takes over at EuPC
  • image Five hurdles for plastics recycling
  • image Billion stops building IMM
  • image Farewell to packaging pioneer Bruno Crocco
  • image Austrotherm targets Ursa XPS
‹ ›

The C3 splitter has landed at Project ONE

Standing nearly 100 meters tall, the key distillation unit will soon rise at the Lillo site, marking a milestone in Europe’s largest petrochemical investment.

August 6, 2025 13:52

ineos project One C3 splitterFollowing the delivery of the furnaces, the C3 splitter — a key component of the new Project ONE petrochemical complex — has reached the Port of Antwerp in recent days.
Bound for Ineos’ massive ethane cracker in Lillo, the splitter is the tallest structure on site, measuring nearly 100 meters.

Transported via a massive pontoon barge through the Kanaaldok and under the Noordlandbrug, the column was offloaded near the construction zone, where it will be hoisted into its final position this August by a heavy-lift crane named Strong Sofie. Once erected, the splitter will become a defining feature of the industrial skyline.

The splitter plays a critical role in the cracker’s operations. During the ethane cracking process, a mixture of hydrocarbons is produced, including the so-called C3 fraction, which contains both propane and propylene — two chemically similar substances with distinct applications.

ineos c3 splitter project one landedThe splitter separates them through high-temperature distillation. Due to the narrow difference in boiling points (36°C for propylene, 46°C for propane), the process requires a very tall distillation column, which explains the splitter’s imposing height.

Managed by Ineos Olefins Belgium, Project ONE involves a €4 billion investment to build a 1.45-million-ton-per-year ethane steam cracker.  Mechanical completion is expected by late 2026, with commissioning set for early 2027.
According to Ineos, once operational, it will be the most efficient and sustainable cracker in Europe, with up to three times fewer carbon emissions than the industry average and half the emissions of the continent’s most efficient existing plants.

© Polimerica -  Reproduction prohibited, all rights reserved

Number of readings: 1558
  • Ineos
  • polyolefins
Share this article on
Print this article

RELATED ARTICLES

EU clears Ineos-Sinopec JV
Ineos cracker bypasses Strait of Hormuz
Dow returns to profit in the second quarter
Aliplast expands recycling operations in Poland
Brindisi polyethylene plant shuts down
Norwegian pyrolysis project unveiled

FOLLOW US

Home
- News - Events - Video - About Us - Sign up free - Advertising - Contact Us - Privacy

Polimerica - Plastics & Rubber News - International edition

Magazine registered at the Milan Court, n.710 - 11/10/2004 - (supplemento a Polimerica)
Editor-in-Chief (Direttore responsabile): Carlo latorre
Redazione: redazione@polimericanews.com
© Cronoart Srl - Milan (Italy)
ISSN 1824-8241 - P.Iva 03143330961
Contact us - Privacy
Reproduction prohibited, all rights reserved. Designed and Powered by JoyADV snc